neowa gets the optimum for you

The optimisation phase of the overall plant must be strictly distinguished – including contractually – from the commissioning and start-up, and it must therefore also be negotiated separately with the customer. As the scope can often be estimated only with great difficulty, remuneration of this should be by time and cost.

 

The timeframe within which the plant is provided to us, neowa GmbH, for optimisation must also be settled.

 

 

 


Do you require a consultation? 
Call us and arrange an appointment with us:

+49 (4131) 28 74 95 - 0

 

neowa GmbH plans, constructs and operates waste management plants exactly where they are needed – at the production location where the waste is generated. This saves time, transport costs and money. The environment is less polluted by CO2 emissions. You have amounts of waste and want to recycle them? Speak to us! Together with you, we will look for the optimal solution.

 

neowa GmbH

Stadtkoppel 34

D-21337 Lüneburg

 

E-Mail: info@neowa.eu